Rissington Bridge

Key points for consideration

  • Alignment significance:  The feasibility of bridge designs is intricately tied to the chosen alignment of the new bridge. Each alignment concept will carry substantial implications, and guidance from mana whenua is of utmost importance. 
  • Land acquisition: Alignments may require land acquisition as part of the project.  
  • Project timeline: The goal is to begin construction on a permanent replacement structure to the community by late-2025. 

Community meetings

Details of community meetings will be added here, as and when confirmed.

Timeline

Construction of bailey bridge Feb – March  2023
Karakia to open bailey bridge    March 2023
Mana whenua engagement, community engagement and site investigations  Mid-2023 ongoing
Feasibility study  Mid-2023 
Community meeting TBC
Pre-application discussions with Hawke's Bay Regional Council (HBRC)  Early-2025
Ecological impact assessment  TBC
Draft methodology and construction drawings  TBC
Tender process to determine contractor Mid-2025 
Resource consent lodgement and processing  TBC
Packaged design delivery  TBC
Blessing ahead of works beginning  TBC
Works begin  Late-2025 
Public open day during works  TBC 
Blessing to open bridge  Early-2027 

Works completed to date

A feasibility study is being conducted to assess and the engineering challenges linked to each potential bridge crossing locations. The study aims to propose bridge concepts that are achievable from an engineering standpoint. The feasibility report is based on the following: 

  • Geometrics 
  • Hydrology and climate effects 
  • Geotechnical/geology considerations 
  • Environmental considerations 
  • Constructability 
  • Cost 
  • Social impacts 
  • Other factors 
Loading...

Hastings District Council - Copyright © 2024 Hastings District Council

Disclaimers and Copyright
While every endeavour has been taken by the Hastings District Council to ensure that the information on this website is accurate and up to date, Hastings District Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Hastings District Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Hastings District Council - / +64 6 871 5000 / customerservice@hdc.govt.nz