skip to main content

I want to...

Current filter:

Rubbish & Recycling Rubbish & Recycling

Ride on recycled plastic bags

Another link in the Hawke’s Bay cycle path chain was officially opened on Friday (October 9); this time a state-of-the-art cycle lane clipped onto the side of the Clive River Bridge.

With a deck made of recycled plastic bags and LED lights embedded in the handrails, the path is a worthy addition to the region’s cycleways that have been evolving over the last 15 years, said deputy mayor Cynthia Bowers at the opening.

Being able to negotiate bridges safely is a “tremendous step forward” for cyclists, she said.

A crowd of about 80 attended the opening at 10am, for a short round of speeches and then a walk over the bridge to refreshments in Farndon Park.

NZTA Napier Highways Manager Chuck Dowdell told the crowd he remembered walking the bridge as a child, and then rowing under it as a teen. He said the bridge had a long history, opening in the same year the Elvis Presley appeared for the first time on television, and Jacques Cousteau’s first marine wildlife programme aired.

That was in 1954. It was built to last, at a height that would see it safe from the sort of floods that had inundated the area in 1897 and 1938. It was constructed to bear the weight of the era’s traction engines, which stood it in good stead to take today’s large trucks heading to Napier Port, he said.

Laid end-to-end the piles would stretch 2.5 kilometres, it was made with 1100 cubic yards of concrete and 250 tonne of steel. “It is testament to the strength of the build in its day, that it remains in good order and we have been able to reconfigure it to keep cyclists safe.”

Associate Minister of Transport Craig Foss said Hawke’s Bay’s cycling culture had led the way in New Zealand in 2010 with its adoption of the i-Ways cycling programme, and continued to do so.

Using the roads is “not something other people do, it is something we all do; our mothers, fathers, children, grandparents – whether we’re in cars or cycling”.

“It requires respect for motorists by cyclists, and respect for cyclists by motorists. It is about sharing and respect.”

The $650,000 cycle path project was led by Hastings District Council and paid for by NZTA.

4 October 2017

Back to Archive

Loading...

Hastings District Council - Copyright © 2024 Hastings District Council

Disclaimers and Copyright
While every endeavour has been taken by the Hastings District Council to ensure that the information on this website is accurate and up to date, Hastings District Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Hastings District Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Hastings District Council - / +64 6 871 5000 / customerservice@hdc.govt.nz